飞凡检测致力于打造国内专业的第三方检测服务公司,不断优化整合市场检测资源,飞凡检测与多家科研院所,如上海同济大学,苏州大学,以及国内众多知名的检测公司进行深度合作,共同为国内制造业服务,为中国的制造业开拓海外市场保驾护航,为我们日常生活的健康安全树立标杆;公司目前工程师百余人,95%以上是本科以上学历;我们合作的实验室通过CNAS,CMA(EZ),所出具的任何一张报告都有CNAS,CMA资质,确保出具的每份报告都具有权威的法律效力。
I. Scope of application:

1. This specifies the electronic mosquito and fly killer laboratory capture and kill effect determination methods and evaluation criteria.
2. This provision of electronic mosquito and fly extinguishers on mosquitoes, flies and the determination and evaluation of the effect of capture and kill
II. test preparation:

(1) mosquito
Light-colored Culex mosquitoes or Culex tiresome mosquitoes, the use of laboratory-reared sensitive strains of standard test worms, feathering the 3rd day ~ 5th day without blood-sucking adult females.
(2) Flies
House flies, using laboratory-reared sensitive strain standardized test worms, adult females and males from day 3 to day 4 after fledging.
(3) Equipment
Test room, approximate square room with a volume of 28 m² and a height of not less than 2.5 m. The two opposite walls are equipped with airtight glass windows that can observe all corners.
III. Test method:

(1) Test conditions
Temperature, 26℃±1℃;
Relative humidity.65%±10%.
(2) Test steps:
1. Mosquito
The test began at 5 p.m., the device under test in the center of the test room, the light source 1.5m above the ground, 100 mosquitoes will be put into the test room, close the doors and windows, to be tested after the return of normal insect activity, connected to the device under test power. Until 8:00 a.m. on the second day, turn off the power and check the number of dead test insects. The test is set up for 3 or more repetitions, and set up a blank control test.
2. Flies
The test starts at 9 a.m., place the test device in the center of the test room, with the light source 1.5 m above the ground, put 100 flies into the test room, close the doors and windows, and turn on the power supply of the test device after the test insects resume their normal activities. At 5 p.m. on the same day, turn off the power and check the number of dead test insects. The test is set up for 3 or more repetitions, and a blank control test is set up.
The evaluation of trapping effect:

Evaluation based on the capture and kill rate, the capture and kill rate of mosquitoes is greater than or equal to 70%, the effect is significant; the capture and kill rate of flies is greater than or equal to 80%, the effect is significant.
Mosquito repellent, insecticide-related standards: can refer to QB/T 4147-2019, GB 24330-2009, GB/T13917.4-2009, GB/T13917.6-2009, GB/T13917.6-2009, GB/T13917.9-2009, NY/T 1151.2-2006.
Feifan testing quality inspection report process:

1、 Provide product information
2、 Engineer according to your product information products recommend the appropriate testing program and give a quote
3、 Confirm that there is no problem with the offer, and then send the sample to our laboratory
4、 Pay for the testing costs, arrange for testing
5、The test is completed, the test report is issued and mailed to the customer.
飞凡检测致力于打造国内专业的第三方检测服务公司,不断优化整合市场检测资源,飞凡检测与多家科研院所,如上海同济大学,苏州大学,以及国内众多知名的检测公司进行深度合作,共同为国内制造业服务,为中国的制造业开拓海外市场保驾护航,为我们日常生活的健康安全树立标杆;公司目前工程师百余人,95%以上是本科以上学历;我们合作的实验室通过CNAS,CMA(EZ),所出具的任何一张报告都有CNAS,CMA资质,确保出具的每份报告都具有权威的法律效力。